Construction starts on Dnieper Hydroelectric StationNov 8, 1927Labels: Dnieper Hydroelectric, Electrification ProjectNatureJMhum
First Five-Year Plan launches heavy-industry driveJan 1, 1928Labels: First Five-Year, State PlanningBritannicaWikipedia
Magnitogorsk steel complex construction beginsJan 1, 1929Labels: Magnitogorsk Iron, Planned CityWikipediaBritannica
First Magnitogorsk blast furnace reaches full operationMar 30, 1932Labels: Magnitogorsk Blast, Pig IronMIAWikipedia
Dnieper dam dedicated and power generation beginsAug 25, 1932Labels: Dnieper Hydroelectric, Power GenerationNatureWikipedia
Chelyabinsk Tractor Plant founded for mechanizationJun 1, 1933Labels: Chelyabinsk Tractor, Machine-buildingWikipediaU M Library
White Sea–Baltic Canal opens using forced laborAug 2, 1933Labels: White Sea, Gulag LaborBritannicaWikipedia
Moscow Metro opens as major urban infrastructureMay 15, 1935Labels: Moscow Metro, Urban InfrastructureWikipediaBritannica
Stakhanovite movement begins with record coal shiftAug 31, 1935Labels: Stakhanovite Movement, Aleksei StakhanovMIAWikipedia
Moscow–Volga Canal opens, built by Gulag laborJul 15, 1937Labels: Moscow Volga, Gulag LaborWikipediaBritannica
Third Five-Year Plan shifts toward armamentsJan 1, 1938Labels: Third Five-Year, Armaments ShiftWikipediaBritannica
Fourth Five-Year Plan begins postwar reconstruction pushJan 1, 1946Labels: Fourth Five-Year, Postwar ReconstructionBritannicaGlobalSecurity
Zhiguli (Kuybyshev) Hydroelectric Station construction startsJan 1, 1950Labels: Zhiguli Hydroelectric, Volga ProjectWikipediaCIA FOIA
Volga–Don Canal opens, linking major river basinsJun 1, 1952Labels: Volga Don, Inland ShippingWikipediaBritannica