Panama Canal Expansion: The Third Locks Project and 2016 Opening (2007–2016)

Panama Canal Expansion: The Third Locks Project and 2016 Opening (2007–2016)

  1. National referendum approves third set of locks

    Labels: Panama referendum, Panama Canal
  2. Groundbreaking begins expansion-era excavation work

    Labels: Groundbreaking ceremony, Pacific access
  3. ACP qualifies consortia to bid on new locks

    Labels: Panama Canal, International consortia
  4. Main locks construction contract awarded to GUPC

    Labels: GUPC, Main locks
  5. Pacific access-channel excavation phase completed

    Labels: Pacific access, Excavation completed
  6. ACP announces expansion schedule slips by six months

    Labels: Panama Canal, Schedule delay
  7. First Pacific-side lock monolith completed

    Labels: Pacific locks, Lock monolith
  8. Work slows amid cost-overrun dispute and stoppage risk

    Labels: Cost overrun, GUPC
  9. ACP and GUPC reach agreement to resume and finish work

    Labels: ACP-GUPC agreement, Construction resumption
  10. New lock chambers begin flooding for operational tests

    Labels: Atlantic locks, Operational testing
  11. Crack reported at Cocolí Locks during testing period

    Labels: Cocol Locks, Concrete crack
  12. First full test transit uses new locks

    Labels: Test transit, New locks
  13. Expanded Panama Canal opens with inaugural Cosco transit

    Labels: Expanded canal, Cosco Shipping