Engineering Milestones: Culebra Cut, Gatun Dam, and the Lock System (1904–1914)

Engineering Milestones: Culebra Cut, Gatun Dam, and the Lock System (1904–1914)

  1. Gatun Dam construction begins on Chagres River

    Labels: Gatun Dam, Chagres River
  2. Goethals takes charge of canal construction

    Labels: George W, Isthmian Canal
  3. Major Cucaracha slide disrupts Culebra Cut

    Labels: Cucaracha slide, Culebra Cut
  4. First concrete poured for Gatun Locks

    Labels: Gatun Locks, concrete work
  5. Pedro Miguel Locks completed on Pacific side

    Labels: Pedro Miguel, Pacific side
  6. Miraflores Locks completed, finishing Pacific lock flights

    Labels: Miraflores Locks, Pacific lock
  7. Gatun spillway gates close, forming Gatun Lake

    Labels: Gatun spillway, Gatun Lake
  8. First trial lockage at Gatun Locks

    Labels: Gatun Locks, seagoing tug
  9. Continuous waterway completed across the isthmus

    Labels: continuous waterway, Panama Canal