Start
End
StartEnd
Updated:Apr 23, 2026
|Privacy Policy

Development of the Saturn V Rocket (1962–1967): Design, Testing, and Qualification

Development of the Saturn V Rocket (1962–1967): Design, Testing, and Qualification

  1. Douglas selected for the S-IVB upper stage

    Labels: Douglas Aircraft
  2. North American wins the Saturn V S-II stage contract

    Labels: North American
  3. Boeing receives the Saturn V S-IC contract

    Labels: Boeing
  4. George Mueller pushes the “all-up” test approach

    Labels: George Mueller
  5. S-IC test stage completes a five-engine static firing

    Labels: S-IC test
  6. S-II structural test article fails under overload

    Labels: S-II structural
  7. Facilities-integration Saturn V rolls out to Pad 39A

    Labels: SA-500F
  8. Douglas S-IVB-503 stage explodes during acceptance testing

    Labels: S-IVB-503
  9. Apollo 1 fire reshapes safety and schedules

    Labels: Apollo 1
  10. First S-IC firing at Mississippi proves stand-stage compatibility

    Labels: B-2 test
  11. First flight S-IC stage completes acceptance firing at Mississippi

    Labels: S-IC-4