Start
End
StartEnd
Updated:Apr 23, 2026
|Privacy Policy

Beijing Olympic Architecture: Bird’s Nest, Water Cube and Related Projects (2003–2008)

Beijing Olympic Architecture: Bird’s Nest, Water Cube and Related Projects (2003–2008)

  1. Beijing wins bid for the 2008 Olympics

    Labels: Beijing, 2008 Olympics
  2. Water Cube design selected in international competition

    Labels: Water Cube, National Aquatics
  3. Olympic Green opens as the venue district

    Labels: Olympic Green
  4. Terminal 3 construction starts at Beijing Capital Airport

    Labels: Terminal 3, Beijing Capital
  5. Bird’s Nest construction halted for cost and safety review

    Labels: Bird s
  6. Retractable roof removed from Bird’s Nest redesign

    Labels: Bird s
  7. National Indoor Stadium breaks ground on Olympic Green

    Labels: National Indoor, Olympic Green
  8. National Indoor Stadium opens for test events

    Labels: National Indoor
  9. Beijing Capital Airport Terminal 3 begins trial operations

    Labels: Terminal 3, Beijing Capital
  10. Olympic Games open, validating the venue program

    Labels: 2008 Olympics, Bird s, Water Cube